Last date of drinking water quality test was September 3, 2010 and valid period is one year. As per management, the facility has signed contract with one testing firm; as per observation, annual test was conducted by that testing form on morning of current audit day, testing report would be issued in about 5 days.上次饮用水水质测试时间为2010年9月3号,有限期为一年,工厂已与一检测公司签订合同,检测公司的人员已于此次审核日当天上午在工厂进行了年度测试, 检测报告将于约5天后颁发。
因工作疏忽,没有提前通知检测机构,再加上检测机构没及时过来检测,造成本厂尚未获得检测告。
已与检测公司签订合同,检测人员也已进行检测。现已收到检测告,请查收附件:饮用水检测报告。
完成日期:2011-09-22
由人事部负责在检测报告到期前两周联络检机构进行检测,确保在司检测报告有效期内进行年度检测。
预防开始日期:2011-09-22
11.25
Last date ofwork shop environment was September 3, 2010 and valid period is one year, as per management, the facility has signed contract with one testing firm; as per observation annual test was conducted by that testing firm on morning of current audit day,testing report would be issued in about 5 days.上次车间工作环境测试时间为2010年9月3号,有限期为一年,工厂已与一检测公司签订合同,检测公司的人员已于此次审核日当天上午在工厂进行了年度测试,检测报告将于约5天后内颁发。